ZHUANG Xufeng, SUN Dong. Influence of tunnel construction on karst water: Case analyses[J]. CARSOLOGICA SINICA, 2016, 35(6): 681-687. doi: 10.11932/karst20160610
Citation: ZHUANG Xufeng, SUN Dong. Influence of tunnel construction on karst water: Case analyses[J]. CARSOLOGICA SINICA, 2016, 35(6): 681-687. doi: 10.11932/karst20160610

Influence of tunnel construction on karst water: Case analyses

doi: 10.11932/karst20160610
  • Publish Date: 2016-12-25
  • Karst areas and karst water are widely present in Guizhou Province.The interaction between tunnel construction and karst water has long beena problem encountered in railway projects in Guizhou. Using the Moxiong and Yinshan tunnelsas examples, this paper attempts to address this issue. Via the interpretation of magnetotelluric data and the application of MIDAS GTS, groundwater problem and its disharmonious relationship with the tunnel are analyzed.After the construction of the Moxiong tunnel was commenced, the groundwater level droppedand did not recoveras expected in the springs at nearby residences, leading to the withering of the springs and severe water shortage in the communities. Yinshan tunnel on the other hand had experienced asevere rainstorm, as a result the karst water pressure elevated and eventually blasted one of the vertical side walls, which damaged the tunnel in a length up to 20 meters, interrupting train pass for more than 24 hours. The lessons from these examples suggest that when selecting the tunnel line in Guizhou, the boundaries of karst water systems should be clarified to avoid the areas with well-developed karst water. In the design stage, full consideration should also be taken to avoid any possible hazard from karst water. During the construction of tunnels, the karst channels encountered should be dredged rather than plugged.

     

  • loading
  • [1]
    蒙彦,雷明堂.岩溶区隧道涌水研究现状及建议[J].中国岩溶,2003,23(4):287-292.
    [2]
    铁道部第二勘察设计院.黄织线磨雄隧道勘察报告[R].2008.4.
    [3]
    铁道部第二勘察设计院.水柏线银山隧道抢险纪要[R].2014.9.
    [4]
    牟忠霞,潘海泽,黄涛.石太客运专线特长隧道岩溶水对隧道影响研究[J].地下空间与工程,2009,5(3):87-89.
    [5]
    吕言新,张猛,董之龙.富水岩溶隧道注浆堵水技术研究[J].中国矿山工程,2012,41(1):60-63.
    [6]
    杜毓超,李兆林,韩行瑞,等.沪蓉高速公路乌池坝隧道区岩溶发育特征及其涌水分析[J].中国岩溶,2008,27(1):11-17.
    [7]
    尚红林,徐鲁勤.基于FlAC3D模型的新集一矿岩溶水危险性研究[J].中国煤炭地质,2011.23(3):31-38.
    [8]
    曹柏树.复杂岩溶地区长大隧道工程地质勘测及评价[J].铁道勘察,2004,(1):37-40.
    [9]
    李新平,代翼飞,胡静.某岩溶隧道围岩稳定性及涌水量预测的流固耦合分析[J].山东大学学报(工学版), 2009,39(4):1-6.
    [10]
    吴治生.岩溶隧道的环境地质问题[J].铁道工程学报,2006,(1):70-73.
    [11]
    胡树林.超高密度电阻率法在岩溶及破碎带探测中的应用[J].物探与化探,2011,35(6):821-824.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (1376) PDF downloads(1284) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return