WEI Jun-fa, MA Rong-guang, YANG Zhang-zhi, HUANG Yun-feng, DING Jian-ping. Forming mechanism of soil cave subside in the Fenghuang transformer substation and control measure[J]. CARSOLOGICA SINICA, 2013, 32(3): 325-329. doi: 10.3969/j.issn.1001-4810.2013.03.012
Citation: WEI Jun-fa, MA Rong-guang, YANG Zhang-zhi, HUANG Yun-feng, DING Jian-ping. Forming mechanism of soil cave subside in the Fenghuang transformer substation and control measure[J]. CARSOLOGICA SINICA, 2013, 32(3): 325-329. doi: 10.3969/j.issn.1001-4810.2013.03.012

Forming mechanism of soil cave subside in the Fenghuang transformer substation and control measure

doi: 10.3969/j.issn.1001-4810.2013.03.012
  • Publish Date: 2013-09-25
  • The Fenghuang substation is located in the planning industrial area in northern Laibin city of Guangxi, occupying about 170 m×160 m in area. Landform there belongs to gentle slope on a karst monadnock covered with soil layer on the surface. Any unfavorable geology such as soil cave is not found during drilling and geophysical prospecting. But dozens of soil caves, 6.81caves/hm2 in density and 489 m2 in total subsiding area, are met in construction period. The development of this kind of soil cave is not only fast, but also comes into being later than surveying works, thus it is easily to be overlooked in the evaluation and leads to constructing accidents. In this paper, forming mechanism of soil cave subside is expounded from the point of geological structure, hydrogeology and hydrometeorology as well as human engineering activities. It is thought that the main reason of the occurrence of soil cave is rainwater infiltration and erosion when the underground peak forest and loose earth exposed after the surface silt-clay layer being cleared away. According to the forming mechanism of soil cave subside, comprehensive treatment method that including increasing drainage ditches and hardening construction site to cut off infiltration pass way of the rainwater is put forth. Furthermore, cyclopean concrete infilling is adopted for treating shallow subsidence, and HIP consolidation grouting is adopted for treating deep subsidence. All the above comprehensive treatment methods have obtained good effect.

     

  • loading
  • [1]
    万志清,秦四清,李志刚,等.土洞形成的机理及起始条件[J].岩石力学与工程学报, 2003,22(8):1377-1382.
    [2]
    王滨,贺可强,高宗军.岩溶塌陷发育的时空阶段性分析[J].水文地质工程地质, 2001,5:24-27.
    [3]
    赵显彭,刘运清,周向弄,等. 岩溶地区路基土洞成因及处理措施[J].交通科技,2004,206(5):35-37.
    [4]
    广西电力工业勘察设计研究院. 合山煤田浸没影响评价报告[R].2004.
    [5]
    徐兴伟,刘靓.碳酸盐岩区土洞的成因分析与工程处理方法[J].甘肃科技, 2010,26(5):133-134.
    [6]
    史宗社.岩溶地区土洞发育的机制及治理[J].西部探矿工程, 2001,73(6):25-26.
    [7]
    广西电力工业勘察设计研究院. 220 kV甘陈变电站工程站址塌陷区原因分析及治理[R].2009.
    [8]
    广西电力工业勘察设计研究院. 220 kV甘陈变电站地面塌陷防治加固施工验收检测报告[R].2009.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (1552) PDF downloads(1404) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return