LU Xiao-peng, TAN Guang-ming. Reservoir building by cave-plugging and the seepage-proofing technique in the Qinghuadong uder ground river[J]. CARSOLOGICA SINICA, 2012, 31(2): 179-184. doi: 10.3969/j.issn.1001-4810.2012.02.011
Citation: LU Xiao-peng, TAN Guang-ming. Reservoir building by cave-plugging and the seepage-proofing technique in the Qinghuadong uder ground river[J]. CARSOLOGICA SINICA, 2012, 31(2): 179-184. doi: 10.3969/j.issn.1001-4810.2012.02.011

Reservoir building by cave-plugging and the seepage-proofing technique in the Qinghuadong uder ground river

doi: 10.3969/j.issn.1001-4810.2012.02.011
  • Received Date: 2012-01-14
  • Publish Date: 2012-06-25
  • In order to solve the problem of water supply for the Funing County and irrigation of the surrounding rural farmlands, a reservoir is built by plugging the Qinghuadong underground river. The designed capacity of the reservoir is 99.34 million cubic meters, blocking body is 87.5 m in height, and the largest impoundment depth is about 116 m. Geological survey proves that there are relatively complete relative-impermeable strata and impermeable strata around the reservoir basin, and the elevation of all spring outcrops is higher than the designed water-storage level. But the geologic structure at the central part of the reservoir is quite complicated and karst is quite developed, and there is cave and fault collapse-body on the left bank near the entrance of the underground river, which easily leads to leakage around the dam. According to the engineering geological conditions at the central part, the 0+085 dam site is arranged in the D3g impermeable layer, where the impact of caves can be kept away and is good for construction for the site being close to the river’s entrance. Furthermore, seepage-proof engineering is conducted to the leakage passages formed by the collapse bodies and the karst fissures with the upper and lower half-closed hanging style curtain grouting. Years of practice shows that the seepage-proof engineering is feasible, the seepage-proof lines and grouting design of the dam site is reasonable, and the cost of the reservoir is low. The seepage-roof engineering effectively solved the county water supply and irrigation water for 22600 mu of farmland 215000 mu of tropical crop downstream.

     

  • loading
  • [1]
    耿弘.云南岩溶地区水资源开发利用[M].云南科技出版社,2002:15-17.
    [2]
    汪文富.贵州普定马官岩溶地下水库成库条件及效益研究[J].中国岩溶,1999,18(1):47-55.
    [3]
    康彦仁,张邦仞.云南蒙自五里冲水库岩溶及其工程处理[J].中国岩溶,2002,21(2):120-130.
    [4]
    邓德仁,张邦仞.五里冲盲谷水库工程的建设经验[J].人民珠江,2000(2):31-33,36.
    [5]
    周宁.鄂西南岩溶槽(盲)谷开发利用方案探讨——以宣恩县洗草坝岩溶盲谷为例[J].地球与环境,2005(b10):229-236.
    [6]
    尹红莲,沈长松,陈治义,等.尼山水库岩溶坝基的防渗处理[J].中国农村水利水电,2004(3):66-67.
    [7]
    赵瑞,许模.水库岩溶渗漏及防渗研究综述[J].地下水,2011(2):20-22.
    [8]
    富宁县清华洞水库第二期工程初步设计报告[R].文山州水利电力勘察设计院,2007.
    [9]
    罗长军.帷幕灌浆技术在既有土坝可溶岩坝基中的应用[J].岩土力学与工程学报,2004,23(22):3910-3916.
    [10]
    曾凡杜.坝面帷幕灌浆技术在竹银水库主坝坝基处理中的应用[J].水利水电科技进展,2011,31(6):55-58.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (2798) PDF downloads(2287) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return