Citation: | LIU Zhaojing, JIANG Xiaozhen, FENG Tao, HUANG Shengping, ZHOU Fubiao, YI Xiaojuan. Formation mechanism and prevention countermeasures for karst collapse in Ertang railway station, Guilin[J]. CARSOLOGICA SINICA, 2023, 42(1): 109-118. doi: 10.11932/karst20230109 |
[1] |
蓝天阳. 二塘站路基岩溶注浆的工程实践[J]. 铁道运营技术, 2019, 25(2):40-42. doi: 10.13572/j.cnki.tdyy.2019.02.014
LAN Tianyang. Grouting construction of subgrade karst in Ertang Station[J]. Railway Operation Technology, 2019, 25(2):40-42. doi: 10.13572/j.cnki.tdyy.2019.02.014
|
[2] |
杨俊东. 衡柳线二塘站复杂岩溶悬挂式帷幕注浆技术研究[J]. 铁道建筑技术, 2020(增1): 204-208.
YANG Jundong. Study on hanging curtain grouting technology for complex karst in Ertang Station of Hengliu Railway[J]. Railway Construction Technology, 2020(Supplement 1): 204-208.
|
[3] |
陈文海, 文江泉, 彭伟. 湘桂铁路提速地段路基岩溶病害注浆整治试验与施工[J]. 路基工程, 2011(3):205-207+210. doi: 10.3969/j.issn.1003-8825.2011.03.060
CHEN Wenhai, WEN Jiangquan, PENG Wei. Experiment and construction of karst subgrade grouting treatment in speed raising section of Hunan-Guangxi Railway[J]. Subgrade Engineering, 2011(3):205-207+210. doi: 10.3969/j.issn.1003-8825.2011.03.060
|
[4] |
胡仁强. 湘桂铁路扩能改造工程桂林段路基岩溶注浆处理效果研究[D]. 成都: 西南交通大学, 2012.
HU Renqiang. Study on karst grouting treatment effect of Xiang-Gui Railway expansion and renovation project in the Guilin section[D]. Chengdu: Southwest Jiaotong University, 2012.
|
[5] |
蒋小珍, 雷明堂. 岩溶塌陷灾害的岩溶地下水气压力监测技术及应用[J]. 中国岩溶, 2018, 37(5):786-791.
JIANG Xiaozhen, LEI Mingtang. Monitoring technique and application of karst groundwater-air pressure for karst collapse[J]. Carsologica Sinica, 2018, 37(5):786-791.
|
[6] |
蒙彦, 郑小战, 祁士华, 雷明堂, 李卓骏, 贾龙. 岩溶塌陷易发区地下水安全开采控制: 以珠三角广花盆地城市应急水源地为例[J]. 中国岩溶, 2019, 38(6):924-929.
MENG Yan, ZHENG Xiaozhan, QI Shihua, LEI Mingtang, LI Zhuojun, JIA Long. Safe pumping in areas prone to karst collapses: A case study of the urban emergency water source of the Guanghua basin in the Pearl River Delta[J]. Carsologica Sinica, 2019, 38(6):924-929.
|
[7] |
姜伏伟, 张发旺, 柳林, 刘伟, 李亮, 陈航. 南宁地铁施工降水诱发岩溶塌陷条件及安全防控措施[J]. 中国岩溶, 2018, 37(3):415-420.
JIANG Fuwei, ZHANG Fawang, LIU Lin, LIU Wei, LI Liang, CHEN Hang. Dewatering induced karst collapse conditions and safety prevention and control measures in Nanning subway construction[J]. Carsologica Sinica, 2018, 37(3):415-420.
|
[8] |
王代连, 王珽, 张兆京. 浅覆盖型岩溶区深基坑涌水的勘察治理: 以桂林市万福路铁路下穿段帷幕灌浆治水为例[J]. 矿产与地质, 2006, 20(6):693-696. doi: 10.3969/j.issn.1001-5663.2006.06.024
WANG Dailian, WANG Ting, ZHANG Zhaojing. Reconnaissance and harnessing for water control in basic pit of shallow overburden type karst area[J]. Mineral Resources and Geology, 2006, 20(6):693-696. doi: 10.3969/j.issn.1001-5663.2006.06.024
|
[9] |
张志林, 马涛, 王秀丽, 刘思源. 悬挂式阻水帷幕地下水控制方法探讨: 以北京地铁8号线永定门外站为例[J]. 城市地质, 2015, 10(2):61-66. doi: 10.3969/j.issn.1007-1903.2015.02.014
ZHANG Zhilin, MA Tao, WANG Xiuli, LIU Siyuan. Discussion on the method about groundwater control with the deaden water purdah above aquifer baseboard: Taking the Beijing Metro Line 8 Yong Ding Men Wai Station as an example[J]. Urban Geology, 2015, 10(2):61-66. doi: 10.3969/j.issn.1007-1903.2015.02.014
|
[10] |
罗成干, 宋满炎, 曾新民. 北江白石窑水电站岩溶坝基防渗处理[J]. 人民珠江, 1999(5):39-42.
LUO Chenggan, SONG Manyan, ZENG Xinmin. Seepage prevention treatment of karst dam foundation of Beijiang Baishiyao Hydropower Station[J]. Pearl River, 1999(5):39-42.
|
[11] |
杨余秀. 贵州上尖坡大坝悬挂式帷幕灌浆施工质量控制要点[J]. 住宅与房地产, 2018(31):193-194.
YANG Yuxiu. Key points of construction quality control for hanging curtain grouting of Shangjianpo Dam in Guizhou[J]. Housing and Real Estate, 2018(31):193-194.
|
[12] |
乔兵, 张大雷, 孙颖. 悬挂式帷幕灌浆在水库加固工程中的应用[J]. 水利规划与设计, 2011(6):77-79. doi: 10.3969/j.issn.1672-2469.2011.06.021
QIAO Bing, ZHANG Dalei, SUN Ying. Application of hanging curtain grouting in reservoir reinforcement project[J]. Water Resource Planning and Design, 2011(6):77-79. doi: 10.3969/j.issn.1672-2469.2011.06.021
|
[13] |
李传军, 刘赤明, 范金星. 悬挂式帷幕灌浆在直界水库除险加固工程中的质量控制[J]. 山东水利, 2006(9): 41-44.
LI Chuanjun, LIU Chiming, FAN jinxing. Quality control of hanging curtain grouting in the reinforcement project of Zhijie Reservoir[J]. Shandong Water Resources, 2006(9): 41-44
|
[14] |
华丽晶. 芜铜铁路狮子山站岩溶塌陷路基勘察与整治研究[J]. 铁道工程学报, 2014(1):32-36. doi: 10.3969/j.issn.1006-2106.2014.01.006
HUA Lijing. Survey and remediation on karst collapse subgrade of Shizhishan station in Wuhu-Tongling Railway[J]. Journal of Railway Engineering Society, 2014(1):32-36. doi: 10.3969/j.issn.1006-2106.2014.01.006
|