FU Kailong, ZHOU Yu, WEI Zhengxiong. Analysis of 6.10 water and mud inrush incident in the exit of parallel pilot tunnel of Chaoyang tunnel of Guiyang-Nanning high-speed railway[J]. CARSOLOGICA SINICA, 2022, 41(6): 895-904. doi: 10.11932/karst20220604
Citation: FU Kailong, ZHOU Yu, WEI Zhengxiong. Analysis of 6.10 water and mud inrush incident in the exit of parallel pilot tunnel of Chaoyang tunnel of Guiyang-Nanning high-speed railway[J]. CARSOLOGICA SINICA, 2022, 41(6): 895-904. doi: 10.11932/karst20220604

Analysis of 6.10 water and mud inrush incident in the exit of parallel pilot tunnel of Chaoyang tunnel of Guiyang-Nanning high-speed railway

doi: 10.11932/karst20220604
  • Received Date: 2021-11-02
    Available Online: 2023-01-06
  • A high-speed railway running 350 km·h−1 is being built between Guiyang in Guizhou Province and Nanning in Guangxi. Chaoyang tunnel is a double-track single-hole tunnel located in southeastern Guizhou. The tunnel clearance is 100 m2with the total length of 12,734 m (including more than 7-km-long soluble rock), and its maximum burial depth is 386 m. The railroad track elevation of the tunnel is 782-468 m, and it gradually decreases from the entrance to the exit, with a slope of −22.7‰ to −25‰. An auxiliary tunnel scheme of "2 transverse tunnels +2 parallel pilot tunnels +1 inclined shaft" has been adopted, with the parallel pilot tunnel on the left side of the main tunnel. The midline of the parallel pilot tunnel is 30 m away from the main tunnel, and 3 m lower than the main hole. The inner headroom size is 5.0 m (width) ×6.0 m (height). Construction of the tunnel began in early 2016 and will be completed in 2022. On June 10, 2018, karst water and mud inrush, lasting about 1 hour, occurred at the exit of parallel pilot tunnel of Chaoyang tunnel. The total amount of water and mud inrush was about 1.6×106 m3. In order to complete the construction tunneling scheme and drainage scheme, it is necessary to analyze the causes of water and mud inrush, evaluate its risk in the subsequent construction, and calculate the water inflow of the tunnel. In this study area, the exit section of the tunnel is in the sloping medium-and-low mountainous area, belonging to the karst peak cluster landform, and the terrain fluctuates greatly. The tunnel passes th exit section of the tunnel is in the sloping medium and low mountainous area, belongs to the karst peak cluster landform with relatively sharp topographic relief. The tunnel passes through a regionally wide and gentle symmetrical anticline, and the exit of the tunnel is located on the southeastern wing of the anticline widely distributed by thick-to-extremely-thick bedded limestone with pure rock texture. Extreme development of surface karst funnels, dissolution basins, karst drop holes, karst caves and other phenomena provides favorable conditions for the collection, infiltration and runoff of surface water, but there is no long-term water system on the surface. After rainfall, the catchment of the non-soluble rock segment is mainly infiltrated through the contact zone between the soluble rock and the non-soluble rock, but the water catchment of the soluble rock section penetrates directly into the underground karst water system through the surface negative topography. Controlled by topography, geomorphology and transverse faults, except for the direction of groundwater seepage along the tectonic line in some sections, the infiltration groundwater is mainly discharged from the Zhangjiang river, which is basically perpendicular to the axis of the anticline and to the southeast wing (the exit of the tunnel). As a result, a series of transverse gullies and underground rivers cutting through the main structural lines were formed. The present study is mainly focused on the following aspects: analyzing the topography, engineering geology and hydrogeology of the tunnel, introducing the implementation of advance geological prediction on the face of the parallel pilot tunnel, and describing the process of water and mud inrush. In this study, the engineering geology and hydrogeology conditions in the area affected by the disaster were investigated and a one-year dynamic observation of the relationship between water inflow and rainfall was also completed. The research finding shows that a huge cavity and pipeline system with a water head of up to 84 m in front of the tunnel face caused the water and mud inrush. After excavation and exposing the bottom of the cavity, the pressurized water flow filling in the whole karst water system carried mud and sand rapidly into the tunnel face and rushed out of the parallel pilot tunnel with a large kinetic energy, resulting in the water and mud inrush event on June 10. In the process of this event, the surrounding karst water system was supplied in time, and the amount of water and mud inrush was much larger than the volume of large dissolution cavity near the tunnel face. The process of "water gushing-water shutoff-water gushing-water shutoff after dredging" occurred many times, indicating that the deposition in the lower part of the cavity is very serious and the drainage is not unobstructed. If the groundwater in the saturated cavity is not discharged effectively, the blasting excavation will cause serious water and mud inrush disaster. Long-term rainfall and water inflow monitoring shows that the karst water system at the exit of the tunnel receives rainfall infiltration recharge and the runoff is unobstructed. The catchment area corresponding to the water inrush to the tunnel is 6.423 km2, and the maximum water inrush in the tunnel after the extreme rainstorm is 5×104 m3·h−1. After the occurrence of water and mud inrush, the static reserves in the mountain body have been fully released, and the groundwater level has dropped to the elevation of the tunnel floor. On the premise of ensuring the unobstructed drainage during the tunneling process, the risk of encountering water and mud inrush in the subsequent construction is low.

     

  • loading
  • [1]
    陈宏峰, 张发旺, 何愿, 夏日元, 邹胜章, 苏春田, 罗书文. 地质与地貌条件对岩溶系统的控制与指示[J]. 水文地质工程地质, 2016, 43(5):42-46.

    CHEN Hongfeng, ZHANG Fawang, HE Yuan, XIA Riyuan, ZOU Shengzhang, SU Chuntian, LUO Shuwen. Geological and geomorphologic settings acting as the controlling factors and indicators for karst systems[J]. Hydrogeology & Engineering Geology, 2016, 43(5):42-46.
    [2]
    孙谋, 刘维宁. 高风险岩溶隧道掌子面突水机制研究[J]. 岩土力学, 2011, 32(4):1175-1180. doi: 10.3969/j.issn.1000-7598.2011.04.037

    SUN Mou, LIU Weining. Research on water inrush mechanism induced by karst tunnel face with high risk[J]. Rock and Soil Mechanics, 2011, 32(4):1175-1180. doi: 10.3969/j.issn.1000-7598.2011.04.037
    [3]
    资谊, 马士伟. 岩溶隧道涌突水灾害发生机理与工程防治[J]. 铁道工程学报, 2011(2):84-89. doi: 10.3969/j.issn.1006-2106.2011.02.017

    ZI Yi, MA Shiwei. Occurrence mechanism and prevention of water-bursting hazard for karst[J]. Journal of Railway Engineering society, 2011(2):84-89. doi: 10.3969/j.issn.1006-2106.2011.02.017
    [4]
    李术才, 王康, 李利平, 周宗青, 石少帅, 柳尚. 岩溶隧道突水灾害形成机理及发展趋势[J]. 力学学报, 2017, 49(1):22-29. doi: 10.6052/0459-1879-16-345

    Li Shucai, Wang Kang, Li Liping, Zhou Zongqing, Shi Shaoshuai, Liu Shang. Mechanical mechanism and development trend of water-inrush disasters in karst tunnels[J]. Chinese Journal of Theoretical and Applied Mechanics, 2017, 49(1):22-29. doi: 10.6052/0459-1879-16-345
    [5]
    李术才,许振浩,黄鑫,林鹏,赵晓成,张庆松,杨磊,张霄,孙怀凤,潘东东. 隧道突水突泥致灾构造分类、地质判识、孕灾模式与典型案例分析[J]. 岩石力学与工程学报, 2018, 37(5):1041-1069. doi: 10.13722/j.cnki.jrme.2017.1332

    LI Shucai, XU Zhenhao, HUANG Xin, LIN Peng, ZHAO Xiaocheng, ZHANG Qingsong, YANG Lei, ZHANG Xiao, SUN Huaifeng, PAN Dongdong. Classification, geological identification, hazard mode and typical case studies of hazard-causing structures for water and mud inrush in tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2018, 37(5):1041-1069. doi: 10.13722/j.cnki.jrme.2017.1332
    [6]
    李芳涛, 李华明, 胡志平, 陈南南, 晏长根. 峨汉高速廖山隧道岩溶发育规律及其工程效应浅析[J]. 中国岩溶, 2020, 39(4):592-603.

    LI Fangtao, LI Huangming, HU Zhiping, CHEN Nannan, YAN Changgen. Features of karst development and geotechnical effects in the Liaoshan Tunnel on the E-Han Expressway[J]. Carsologica Sinica, 2020, 39(4):592-603.
    [7]
    任亚楠, 万军伟, 黄琨, 何欣慧. 云南万寿山地区岩溶水系统特征及隧道选线研究[J]. 中国岩溶, 2020, 39(4):604-613.

    REN Yanan, WAN Junwei, HUANG Kun, HE Xinhui. Study on the characteristics of karst water system and tunnel route selection in Wanshoushan area, Yunnan Province[J]. Carsologica Sinica, 2020, 39(4):604-613.
    [8]
    张桥. 小三峡岩溶隧道围岩防突层安全厚度有限元分析[J]. 中国岩溶, 2020, 39(4):614-621.

    ZHANG Qiao. Finite element analysis on safety thickness of the inrush prevention layer in rock beds of the Small Three Gorges karst tunnel[J]. Carsologica Sinica, 2020, 39(4):614-621.
    [9]
    李潇, 漆继红, 许模. 西南典型紧窄褶皱小尺度浅层岩溶水系统特征及隧道涌水分析[J]. 中国岩溶, 2020, 39(3):375-383.

    LI Xiao, QI Jihong, XU Mo. Analysis on the characteristics of small-scale shallow karst water systems in typical tight-narrow folds and tunnel water inrush in Southwestern China[J]. Carsologica Sinica, 2020, 39(3):375-383.
    [10]
    贺华刚. 深埋特长隧道的突涌水危险性评价研究[J]. 中国岩溶, 2020, 39(3):384-390.

    HE Huagang. Assessment of water inrush risk in deep buried long tunnels[J]. Carsologica Sinica, 2020, 39(3):384-390.
    [11]
    郑克勋, 裴熊伟, 朱代强, 吴述彧, 郭维祥. 岩溶地区地下水位变动带隧道涌水问题的思考[J]. 中国岩溶, 2019, 38(4):473-479.

    ZHENG Kexun, PEI Xiongwei, ZHU Daiqiang, WU Shuyu, GUO Weixiang. Thoughts on tunnel water inrush in changing zones of groundwater level in karst areas[J]. Carsologica Sinica, 2019, 38(4):473-479.
    [12]
    何桥, 朱代强, 郑克勋, 朱建耘, 黄勇. 深埋特长隧道岩溶高压涌水灌浆封堵技术研究与实践[J]. 中国岩溶, 2019, 38(4):488-495.

    HE Qiao, ZHU Daiqiang, ZHENG Kexun, ZHU Jianyun, HUANG Yong. Application of grouting sealing technology on karst high-pressure water inrush in a deep-buried extra-long tunnel[J]. Carsologica Sinica, 2019, 38(4):488-495.
    [13]
    庄旭峰, 孙东. 实例分析隧道建设对岩溶水的影响[J]. 中国岩溶, 2016, 35(6):681-687.

    ZHUANG Xufeng, SUN Dong. Influence of tunnel construction on karst water: Case analyses[J]. Carsologica Sinica, 2016, 35(6):681-687.
    [14]
    张可能, 张岳, 廖阳, 万浩然, 许培浩, 张云毅. 贵阳某地铁车站岩溶发育特征及突水模式分析[J]. 中国岩溶, 2018, 37(2):300-306.

    ZHANG Keneng, ZHANG Yue, LIAO Yang, WAN Haoran, XU Peihao, ZHANG Yunyi. Analysis on karst development and water burst in a subway station[J]. Carsologica Sinica, 2018, 37(2):300-306.
    [15]
    陈国亮. 岩溶工程地质[M]. 北京: 中国铁路出版社, 1984: 86-93.

    CHEN Guoliang. Karst engineering geology[M]. Beijing: China Railway Publishing House, 1984: 86-93.
    [16]
    毛邦燕, 许模, 蒋良文. 隧道岩溶突水、突泥危险性评价初探[J]. 中国岩溶, 2010, 29(2):183-189. doi: 10.3969/j.issn.1001-4810.2010.02.013

    MAO Bangyan, XU Mo, JIANG Liangwen. Preliminary study on risk assessment of water and mud inrush in karst tunnel[J]. Carsologica Sinica, 2010, 29(2):183-189. doi: 10.3969/j.issn.1001-4810.2010.02.013
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (2011) PDF downloads(81) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return