Citation: | ZHANG Yanlong, TIAN Qingyan, ZHANG Jiantong. Water disaster analysis and numerical simulation of a karst tunnel in a highway of Guangdong Province[J]. CARSOLOGICA SINICA, 2018, 37(2): 307-313. doi: 10.11932/karst20180219 |
[1] |
Asakura T, Kojima Y. Tunnel maintenance in Japan[J].Tunnelling and Underground Space Technology,2003,18(2):161-169.
|
[2] |
Day M J. Karstic problems in the construction of Milwaukee’s Deep Tunnels[J].Environmental Geology,2004,45(6):859-863.
|
[3] |
WANG Y, CHEN Q, WEI Y, et al. Water/Rock Interaction Mechanism in Deep-buried Tunnels in Karst Area [J]. China Railway Science, 2004, 4:10.
|
[4] |
Liansheng T, Pengcheng Z, Sijing W. Testing study on macroscopic mechanics effect of chemical action of water on rocks [J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(4): 526-531.
|
[5] |
Kim Y I, Amadei B, Pan E. Modeling the effect of water, excavation sequence and rock reinforcement with discontinuous deformation analysis[J]. International Journal of Rock Mechanics and Mining Sciences, 1999, 36(7): 949-970.
|
[6] |
李术才,赵岩,徐帮树,等.海底隧道涌水量数值计算的渗透系数确定方法[J].岩土力学, 2012, 33(5):1497-1504.
|
[7] |
吴明亮,漆继红,许模,等.川东南隔挡式构造区隧道空间展布影响下岩溶涌突水特征简析[J].中国岩溶,2016,35(2):190-196.
|
[8] |
庄旭峰,孙东.实例分析隧道建设对岩溶水的影响[J].中国岩溶,2016, 35(6):681-687.
|
[9] |
许和平.对南昆线(西段)隧道衬砌漏水整治的思考[J].铁道工程学报,1999,16(2):63-68.
|
[10] |
魏兴萍,张虹,苏程烜.重庆南山隧道工程涌水隐患研究[J].中国岩溶,2016,35(1):74-80.
|
[11] |
庾乐,王礼恒,王举平.广西平南某矿区岩溶地下水连通试验研究[J].中国岩溶,2014, 33(1):31-36.
|
[12] |
李铮,何川,杨赛舟,等.不考虑开挖扰动影响的隧道涌水量预测模型试验研究[J].岩石力学与工程学报,2016,35(12):2499-2506.
|
[13] |
赵旭东.隧道渗漏水的病害整治[J].西部探矿工程,2001,13(2):72-73.
|
[14] |
陈荣国.富水地区隧道渗漏水整治措施[J].现代隧道技术,2002,39(3):65-68.
|
[15] |
祝和权,李海燕,杜存山.隧道渗漏水综合治理技术的研究[J].中国铁路,2004(5):42-45.
|
[16] |
江亦元,王星华.昆仑山隧道渗漏水原因探讨及治理[J].中国铁道科学,2005, 26(4):52-56.
|